logo

Shanghai Minggong Heavy Equipment Co., Ltd

E-mail:sales@jxjq.com
You Are Here:Minggong home >> news
NEWS

installation of sand making machine

 

After you bought the third generation Fine Impact Crusher,how to install it is a big problem,if it install unfair,the whole sand production line will stop,this is not only taking harmful to equipment,but also have possibility to hurt the operator of the equipment.

In the many stone and sand production line,the fine Sand Making Machine always go with the rough crusher,.
According to the place of the crushing,the 3rd generation Fine Crusher have different place either.
Most of the time,we install it in the work shop or in the open air.before the install,at first we must check the packing list,to see all the spare part ,when install,we keep the Sand Making Machine flat(its main axis perpendicular to the horizontal.)

The sand making’s two sides and above should leave some space,in case when repairing,it needs sling.after installation ,we should test again.:
Eg:whether the tube of the lubricating oil is steady.before the operation of the Sand Crusher,we must add the lubricating oil again,see whether there is a eyewinker on the impelle,check the motor wire circle,any trouble occur ,it must stop at once.


Correlation Information

  Product name:    *
  Product model:    *
  Orders units:   
  The address:   
  Number of units:    *   E-mail:    *
  Contact:      Post:   
  Telephone:    *   Fax:   
  Mobile:      Postal code:   
  Special technical requirements:
  
             
Copyright @ 2011. Shanghai Minggong Heavy Equipment Co.,Ltd.All Rights Reserved
International Trade Department:0086-21-59515633 59515366 E-mail:sales@jxjq.com
Address: No.299 Shenzhou Road,Fengxian District,Shanghai,China. P.C: 201499